Step-by-step installation instructions, wiring diagrams, and maintenance tips to ensure safe, compliant, and long-lasting deployment of your Jinborui lighting products.

Section 01

Solar Street Light Installation

Solar street light installation diagram

Before installation, verify that all components -- solar panel, LED lamp head, lithium battery, and pole -- match the specifications listed in the product datasheet. Ensure the installation site receives a minimum of 6 hours of direct sunlight per day.

  1. Site Assessment & Foundation

    Survey the installation site for soil bearing capacity. Excavate the foundation pit to the specified depth (typically 1.2-1.5 m). Pour concrete with embedded anchor bolts according to the supplied foundation drawing. Allow a minimum 72-hour curing time before pole erection.

  2. Pole Assembly & Erection

    Thread all internal cables through the pole before assembly. Attach the lamp arm and tighten all bolts to the specified torque (refer to product manual). Use a crane or suitable lifting equipment to erect the pole and secure it to the anchor bolts. Verify vertical alignment with a spirit level.

  3. Solar Panel Orientation

    Mount the solar panel bracket at the top of the pole. Adjust the panel tilt angle to match the local latitude (typically latitude ± 5°). Orient the panel toward true south (Northern Hemisphere) or true north (Southern Hemisphere). Avoid shading from trees, buildings, or adjacent poles.

  4. Battery & Controller Connection

    Install the lithium battery pack inside the dedicated battery compartment. Connect the battery to the solar charge controller following the sequence: battery first, then solar panel, then load. Ensure correct polarity at all terminals. Seal all cable entry points with waterproof glands (IP65 or higher).

  5. Commissioning & Testing

    Power on the system and verify the charge controller indicator lights show normal operation. Manually trigger the light sensor to confirm the lamp activates at dusk. Test PIR motion sensing (if applicable). Record the initial battery voltage and charging current for baseline reference.

Safety Warning

All electrical connections must be performed by a qualified electrician. Never short-circuit the battery terminals. Ensure the system is de-energized before performing any maintenance or wiring work.


Section 02

LED Street Light Installation

LED street light installation process

LED street light installation requires connection to a mains power supply. Ensure all civil works -- including conduit laying, junction boxes, and pole foundations -- are completed and inspected before beginning electrical installation.

  1. Pre-Installation Inspection

    Inspect the LED fixture for any transit damage. Verify the input voltage rating matches the local grid supply (220V/110V AC). Check that the IP rating (minimum IP65) and IK rating are appropriate for the installation environment.

  2. Pole & Arm Mounting

    Mount the lamp arm to the pole at the specified height (typically 6-12 m depending on road width). Tighten the arm clamp bolts to the torque specified in the installation manual. Ensure the arm extends over the road at the correct overhang distance per the lighting design plan.

  3. Fixture Attachment & Aiming

    Attach the LED fixture to the arm using the supplied mounting hardware. Adjust the tilt angle (typically 0-15°) according to the DIALux lighting simulation report to achieve the required road illuminance uniformity. Lock the tilt adjustment screw securely.

  4. Mains Electrical Connection

    Route the supply cable through the pole conduit and into the fixture's terminal block. Connect Line (L), Neutral (N), and Earth (PE) conductors to the corresponding terminals. Apply waterproof tape to all external cable joints. Install an appropriate fuse or MCB at the distribution board.

  5. Earthing & Surge Protection

    Connect the pole earth terminal to the main earthing system with a minimum 6 mm² copper conductor. Install a surge protection device (SPD) at the distribution panel if not already integrated into the fixture. Verify earth continuity with a resistance meter (target: < 4 Ω).

  6. Power-On & Photometric Verification

    Energize the circuit and verify the fixture illuminates at full output. Use a lux meter to spot-check road illuminance levels against the design specification. For 4G/5G IoT-enabled fixtures, commission the network module and register the device on the central management platform.

IoT Commissioning Note

For 4G/5G smart lighting fixtures, ensure a valid SIM card with data plan is inserted prior to installation. Contact Jinborui technical support for NMS platform credentials and device provisioning assistance.


Section 03

Wiring Diagram

The diagrams below illustrate the standard wiring configurations for both solar and grid-connected LED street light systems. Always refer to the product-specific wiring diagram supplied in the product packaging.

Solar Street Light -- System Wiring

Grid-Connected LED Street Light -- Wiring

Standard Wire Color Codes

Wire Function Color (IEC) Color (NEC/US) Notes
AC Live (Line) Brown Black High voltage -- handle with care
AC Neutral Blue White Return path
Protective Earth Green/Yellow Green Must be continuous
DC Positive (+) Red Red Solar / battery positive
DC Negative (−) Black Black Solar / battery negative

Section 04

Maintenance Tips

Regular preventive maintenance extends product lifespan, maintains lighting performance, and reduces total cost of ownership. Follow the schedule below to keep your Jinborui street lighting systems operating at peak efficiency.

Monthly

Visual inspection of lamp operation, pole condition, and cable entry seals.

Quarterly

Clean solar panels, check battery voltage, inspect controller parameters and connections.

Annual

Full system audit: torque check, earth resistance test, battery capacity test, lux measurement.

Solar Panel Cleaning & Care
  • Clean panels every 1-3 months depending on dust levels. Use a soft cloth or sponge with clean water -- avoid abrasive cleaners or high-pressure jets.

  • Inspect the panel surface for micro-cracks, discoloration, or delamination. Replace panels showing visible damage immediately to prevent fire risk.

  • Verify the panel tilt angle has not shifted due to wind or vibration. Re-adjust and retighten mounting hardware as needed.

  • Check for shading caused by new vegetation growth. Trim overhanging branches to maintain unobstructed solar exposure.

Battery Maintenance & Replacement
  • Measure battery open-circuit voltage quarterly. A healthy lithium battery should read within the manufacturer's specified range (typically 12.6-13.2 V for a 12 V system at full charge).

  • Inspect battery terminals for corrosion or loose connections. Clean terminals with a dry cloth and apply anti-corrosion spray if required.

  • Lithium batteries typically have a service life of 3-5 years. Replace when capacity drops below 70% of rated capacity, or when the light operates fewer than the rated backup days.

  • Dispose of spent batteries according to local environmental regulations. Contact Jinborui for spare parts supply and battery replacement guidance.

LED Fixture & Optics Maintenance
  • Clean the lens cover annually with a soft, lint-free cloth and mild detergent. Dust and insect deposits on the lens can reduce light output by up to 20%.

  • Inspect the fixture housing gaskets annually. Replace deteriorated gaskets to maintain IP65+ ingress protection and prevent moisture damage to internal electronics.

  • LED modules typically last 50,000+ hours (L70). If noticeable lumen depreciation or color shift is observed before this point, contact Jinborui technical support for assessment.

Pole & Structural Inspection
  • Visually inspect poles for corrosion, rust spots, or physical damage after severe weather events. Touch up galvanized coatings with zinc-rich paint where surface damage is observed.

  • Check anchor bolt torque annually. Re-torque any loose bolts to specification. Inspect the base plate for standing water and ensure the drainage hole is clear.

  • Inspect the access door seal and lock mechanism. Replace worn seals to prevent water ingress into the cable compartment. Ensure the door is fully closed and locked after any maintenance.

Troubleshooting Quick Reference

Symptom Likely Cause Recommended Action
Light does not turn on at night Discharged battery / faulty light sensor Check battery voltage; clean or replace light sensor
Short operating hours per night Reduced battery capacity / dirty solar panel Clean solar panel; perform battery capacity test
Flickering or unstable light output Loose wiring / failing LED driver Inspect all terminal connections; replace LED driver if faulty
Light remains on during daytime Light sensor blocked or failed Clean sensor surface; replace sensor if defective
Battery not charging Solar panel shading / controller fault / wiring issue Check panel exposure; inspect controller indicators; verify DC wiring polarity
Reduced lumen output Dirty lens / LED depreciation Clean lens cover; measure lux output and compare to design spec